print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all TGC-1 press releases

TGC-1

April 28, 2017

TGC-1 presents its performance highlights for Q1 2017

Electricity output of TGC-1, including PJSC Murmanskaya CHPP, for Q1 2017 comprised 7,564.0 million kWh, which is 5.5% less than for the same period of 2016.

TGC-1 Electricity Output Summary (million kWh)

 

1Q 2016

1Q 2017

Difference

Nevsky branch

5,099.5

4,850.3

-4.9%

Karelsky branch

1,089.9

931.7

-14.5%

Kolsky branch

1,803.3

1,775.1

-1.6%

TGC-1 total

7,986.7

7,557.1

-5.4%

PJSC “Murmanskaya CHPP”

7.5

6.8

-8.8%

TGC-1 total, including

PJSC “Murmanskaya CHPP”

7,994.2

7,564.0

-5.5%

Due to market conditions electricity generation at CHPPs decreased by 6.5%, at HPPs – by 3.8% (due to lower water content at Karelsky and Kolsky branches).

An average specific fuel equivalent consumption of electricity output of the Company remained at last year’s level and comprised 188.91 g/kWh.

For Q1 2017, heat output of TGC-1, including PJSC Murmanskaya CHPP, comprised 9,485.1 thousand g/kWh, which is 3.2% lower compared to 2016. Reduction in heat output was caused by climatic factors.

TGC-1 Heat Output Summary (thousand Gcal)

 

1Q 2016

1Q 2017

Difference

Nevsky branch

7,663.1

7,478.2

-2.4%

Karelsky branch

717.7

674.6

-6.0%

Kolsky branch

581.9

534.5

-8.1%

TGC-1 total

8,962.7

8,687.3

-3.1%

PJSC “Murmanskaya CHPP”

836.8

787.7

-4.7%

TGC-1 total, including

PJSC “Murmanskaya CHPP”

9,799.5

9,485.1

-3.2%

An average specific fuel equivalent consumption of heat output of the Company reduced by 0.5% to 167.47 kg/Gcal.

For more information about the results of the company’s production activities, please visit the Reportssection of the corporate website.

About

TGC-1 is the leading producer of electricity and heat in the North-West region of Russia. It operates 53 electric generating stations in four regions of Russia: St. Petersburg, Republic of Karelia, Leningrad Oblast, and Murmansk Oblast.

TGC-1 installed electric capacity of the Company’s stations amounts to 6.95 GW and heating capacity of 14,53 thous. GCal/hr. Major shareholders are Gazprom Energoholding LLC (51.79 %) and Fortum Power and Heat Oy (29.45 %). Total headcount of the Company, including subsidiaries, totals circa 7 thousand.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer