print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all TGC-1 press releases

TGC-1

October 28, 2019

TGC-1 presents its performance highlights for 9 month of 2019

Electricity output of TGC-1, including PJSC Murmanskaya CHPP, for 9 month of 2019 comprised 20,363.6 million kWh, which is 5.5% lower than for the same period of 2018.

At the same time, the comparable electricity output at TGC-1 condensed heat power plants increased by 1.0%, which is due to market situation, as well as the need to ensure reliability of the power system in accordance with the load schedule of the power equipment upon the request of the System Operator of the United Power System.

The electricity output by HPPs decreased by 12.8% due to the lower water content in the regions where company operates throughout the reporting period.

TGC-1 electricity output summary (million kWh)

 

9M 2018

9M 2019

Difference

Nevsky branch

13,244.8

12,613.2

-4.8%

Karelsky branch

2,806.1

2,726.3

-2.8%

Kolsky branch

5,494.4

5,014.2

-8.7%

TGC-1 total

21,545.4

20,353.7

-5.5%

PJSC Murmanskaya CHPP

9.7

9.9

+2.1%

TGC-1 total, including
PJSC Murmanskaya CHPP

21,555.1

20,363.6

-5.5%

The volume of heat output from collectors of TGC-1, including PJSC Murmanskaya CHPP, comprised 16,046.5 thousand Gcal, which is 2.4% lower than for the same period in 2018 due to unusually warm weather conditions in the first quarter of 2019. 

TGC-1 heat output summary (thousand Gcal)

 

9M 2018

9M 2019

Difference

Nevsky branch

12,873.6

12,491.9

-3.0%

Karelsky branch

1,181.9

1,122.7

-5.0%

Kolsky branch

962.9

1,015.8

5.5%

TGC-1 total

15,018.4

14,630.4

-2.6%

PJSC Murmanskaya CHPP

1,416.3

1,416.1

0.0%

TGC-1 total, including
PJSC Murmanskaya CHPP

16,434.7

16,046.5

-2.4%

For more information about the results of the company’s production performance, please visit the Reportssection of the corporate website.

About

TGC-1 (part of Gazprom Energoholding Group) is a leading producer and supplier of electricity and heat in the North-West of Russia. TGC-1 comprises 53 power plants within four constituent entities of the Russian Federation: St. Petersburg, the Republic of Karelia, and Leningrad and Murmansk Oblasts.

TGC-1's installed electric capacity is 6.95 GW, and heat capacity is 13.75 thousand Gcal/h. Major Shareholders: Gazprom Energoholding LLC (51.79%) and Fortum Power and Heat Oy (29.45%).

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer