Home  Issuers' Corner  Press Releases
CLOSE

Press Releases

company search
all press releases
all MOSENERGO (TGC-3) press releases

MOSENERGO (TGC-3)

September 19, 2002

Last week AO MOSENERGO reconstructed 14 electric lines damaged as a result of peat fires

Since the end of last week, AO MOSENERGO has not registered any new ruptures of electric lines in the Moscow region. On September 13, the specialists from Kolomna Electric Grids completed the repair of the aerial 110 kV line in the Lukhovitsy area.

Due to damages caused by fires, the power is cut off at four aerial 100-220 kV lines. The reconstruction of two 110 kV lines going through Orekhovo-Zuevo and neighboring districts may take up to two months. In Sergiev Posad district fires occurred in areas along electric lines threatening new ruptures.

AO MOSENERGO is using its own resources to eliminate damage to aerial lines. The company is conducting repairs on a continuous basis including on weekends. To clear tree blockages near damaged lines, AO MOSENERGO is cooperating with forestry services and construction organizations. Heads of AO MOSENERGO's branches are requesting special-purpose vehicles at local fire-fighting emergency commissions created by district administrations.

AO MOSENERGO is supplying in full electric power to all its consumers.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z



Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer