Home  Issuers' Corner  Press Releases  Rosseti Volga
CLOSE

Press Releases > Rosseti Volga  all about the company

company search
all press releases
all Rosseti Volga press releases

Rosseti Volga

May 18, 2018

Chuvashenergo branch power engineers are ready to perform large scale repair works

On the threshold of the 2018 repair campaign Chuvashenergo, a branch of IDGC of Volga, PJSC (a member of Rosseti Group), received a permit for large scale repair works based on a report.

Before granting the permit, production departments of the enterprise were thoroughly inspected in accordance with the regulations on preparation for large scale repair works. Enterprise personnel had its knowledge tested, was medically examined, practiced safe methods of works performance in power plants.

Another critical component of preparation for large scale repair works is maintenance of good condition of the necessary mechanisms, tools, accessories, rigging and protection equipment, availability of personnel uniforms and safety shoes resistant to electric arch. The program of power facilities repair is one of the main actions for power engineers of Chuvashenergo branch to improve reliability and quality of power supply of consumers. Successful autumn-winter period to a large degree depends on its performance.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z



Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer