print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all GAZPROM press releases

GAZPROM

March 2, 2009

Gazkomplektimpex and Siirtec Nigi sign GTU engineering and construction contract within Nord Stream project

Igor Fyodorov, Member of the Gazprom Management Committee, Director General of Gazkomplektimpex and Adalberto Bestetti, President of Siirtec Nigi S. p. A. signed an engineering and construction contract for a gas treatment unit (GTU). The unit is to be installed at the Portovaya compressor station (CS) of the Nord Stream gas trunkline.

The GTU construction project is a unique solution as it stipulates creating a unit having nowadays no world analogues by its performance rates. The unit is intended for dehydration of 170 million cubic meters of natural gas per day. This is 3.6 times exceeds the capacity of the GTU at the Krasnodarskaya CS of the Blue Stream gas pipeline running across the Black Sea bottom from Russia to Turkey.

Pursuant to the contract, Siirtec Nigi S. p. A. will carry out the engineering, supervised installation and commissioning of the GTU as well as will ensure the supply of required equipment and materials. The first stage of the unit is projected to be installed in December 2010, the second – in December 2011.

Taking part in the open competition for the GTU were several international and domestic equipment suppliers. The competitive bid from Siirtec Nigi S. p. A. was chosen as it was best matched to the customer demands in terms of comprehensive engineering, pricing conditions, and the guarantees of timely and high-quality implementation of the project.

 

Background:

The Nord Stream gas pipeline is a fundamentally new route for Russian gas exports to Europe. The gas pipeline will run across the Baltic Sea from the Portovaya Bay (in the vicinity of Vyborg) to the German coast (in the vicinity of Greifswald). The gas pipeline length will be some 1,200 km.

Located at the Russian coast of the Baltic Sea in the Portovaya Bay, the Portovaya CS will be a unique gas transmission facility with capacity (354 MW) unparalleled in Russia. Advanced equipment and modern technologies will be used for its construction.

Siirtec Nigi S. p. A. is an Italian company operating on the international market and dealing with the adoption of proper and attracted technologies for sulfur recovery, acid gas removal and ecological purification. The company has implemented over 500 successful projects in more than 40 countries.

Gazkomplektimpex is a 100 per cent subsidiary of Gazprom. In 2002 Gazkomplektimpex was identified as the major procurement company for the subsidiary companies and enterprises of Gazprom.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer