Home  Issuers' Corner  Press Releases
CLOSE

Press Releases

company search
all press releases
all Unified Energy System press releases

Unified Energy System

January 12, 2004

First Russian power boiler BK 420-140 KS with bubbling bed launched into pilot operation at Barnaulskaya CHPP-3 of OAO "Altayenergo"

Moscow. 12 January 2004. The use of the new power boiler at Barnaulskaya CHPP-3 will help reduce the emissions of sulphur dioxide and nitrogen oxides, which will significantly improve the environment situation in the area and help reduce the emission charges paid by the power plant. Besides, the BKZ 420-140 KS boiler of 420 t/h steam output is smaller compared to other boilers.

The integrated testing of the new boiler has proved, on the whole, that the engineering decisions used in the boiler are correct and will ensure its reliable operation. Upon completion of the installation, it is planned to start batch manufacturing of the BKZ 420-140 KS boilers, which will be used for renovation of the existing CHPPs and construction of new ones.

The boiler was designed and implemented by OAO "Altayenergo", OAO "VTI", OAO "Sibenergomash", ZAO "Elittekhnostroy", and the Altay State Technical University, with the assistance of the Department for re-equipment and improving energy repairs of RAO "UES of Russia".

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z



Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer