print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all TGC-9 press releases

TGC-9

October 1, 2007

Chaykovskaya thermal power station-18 and the Permskie thermal networks - branches of TGK-9 received passports of production availability for service during the autumn-winter period

Perm. Results of works of the first commissions on readiness check of TGK-9 branches of the Perm area to work during the autumn-winter period 2007-2008 are summed up

The first passports of production availability for service during the autumn-winter period among branches TGK-9, located in the Perm area, are handed over to the Perm thermal networks and Chaykovsksya thermal power station-18. A geographical zone of service of the Perm thermal networks - Perm and Krasnokamsk. In structure of branch TGK-9 - six operational areas, providing a heat supply of habitation, the industrial enterprises and objects of social sphere. On balance of EHS - about 660 km of the main thermal networks, and the attached thermal loading make 3588 Gcal/hour. Within the limits of preparation for the autumn-winter period during repair 4,9 km of networks were shifted in Perm in one-trumpet calculation, major overhaul of networks of 4,7 km was lead.

Electric capacity of Chaykovskaya thermal power station-18 makes 220 megawatt, thermal - 466 Gcal/hour. The power station provides power supply of inhabitants of Tchaikovsky and the largest enterprises of city, the part of energy is exported to other regions. During repair campaign for preparation of thermal power station-18 for reliable work in conditions of winter loadings, major overhaul of a turbogenerator was lead.

Within the limits of preparation for the autumn-winter period in branches of TGK-9 reliable work of equipment in conditions of the maximal loadings was provided, the necessary stock of reserve fuel was created, the personnel was prepared, industrial and household cases of stations were warmed. Experts of commissions on check of readiness of the power equipment by the winter, marked a high level of preparation of TGK-9 branches to work in conditions of the increased loadings.

Within October the estimated commissions will check up readiness for winter of other TGK-9 branches located in the Perm area.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer